тЧП This is a preliminary quotation based on the initial site visit and is subject to verification by our Head Office. A final, approved digital copy will be shared after review.
┬а
тЧП Any calculation or estimation errors found during verification may lead to a revision of the final quotation.
┬а
тЧП The report is based on visual observations during the inspection and does not include hidden or inaccessible issues.
┬а
тЧП The inspection and diagnosis are carried out using established technical methods and professional expertise, achieving an accuracy level of approximately 90% in identifying visible and accessible sources of defects. However, certain sources particularly those concealed within structural elements or inaccessible areas may remain undetected during the initial assessment. In such cases, a rule-out diagnostic procedure is proposed as a systematic and cost-effective method to narrow down and identify the hidden source. If seepage or related issues persist following the recommended repair works, it shall be deemed an indication of a possible concealed or secondary source that was not detectable during the initial inspection. The rule-out procedure will then be implemented to determine and address the underlying cause.
┬а
тЧП We aim to provide simple and cost-effective solutions. Major repairs or civil modifications are only recommended when absolutely necessary.
┬а
тЧП Treated areas may take up to a month to fully dry, depending on site conditions. Immediate results should not be expected.
┬а
тЧП Dampness reduction depends on severity and conditions, with typical drying times of 2-4 weeks (mild), 4-8 weeks (moderate), and 2-3 months or longer (severe). These timelines may vary with site conditions, ventilation, and weather.
┬а
тЧП If dampness does not reduce within the expected timeframe, the customer must report it to CyondтАЩs engineer for reassessment and further diagnostics.
┬а
тЧП Customers are expected to monitor the treated areas and inform us of any recurring issues.
┬а
тЧП This quotation and report are valid for a limited period. Delays or changes in scope may lead to revisions.
┬а
тЧП Any civil works like demolition or reconstruction must be confirmed in writing with our Head Office. Cyond is not responsible for issues caused by unapproved work.
┬а
тЧП Our responsibility is limited to the scope of inspection and recommendations. We are not liable for issues discovered later or outside the inspected areas.
┬а
тЧП The final quotation will include all applicable terms, including payment, warranty (if any), and scope of service.
┬а
тЧП Photos taken during inspection are for reference, internal documentation and training purpose only. They are not a complete record of site conditions.
┬а
тЧП If third-party work is done without consulting us, our advice or warranty will stand void.
┬а
тЧП By proceeding with the solutions, the customer agrees to the above terms and will cooperate during execution.
┬а
тЧП If the inspection area or time exceeds the booked limits, the customer will be informed on-site, and additional charges will apply. Any extra requests beyond the original booking will only be considered if the engineer has no other scheduled appointments. Payment must be made on-site before proceeding with additional services.
┬а
тЧП Slot booking is subject to availability and confirmation. Any booking fee paid is non-refundable but will be adjusted against inspection charges.
┬а
тЧП Rescheduling or cancellation must be informed at least 48 hours in advance. Cancellations within 48 hours will incur 50% of the inspection fee.
┬а
тЧП If the property is locked, inaccessible, or no authorized person is present to provide access/decisions, the visit will be considered completed. A re-visit can be arranged with applicable charges.
T&C for BOQ :
┬а
By booking an inspection, approving a quotation, or proceeding with services, the customer acknowledges and agrees to these Terms & Conditions in full.
Your trusted partner in pioneering proactive maintenance and sustainable solutions – building a smarter, greener future for the construction industry.
DonтАЩt miss our future updates! Get Subscribed Today!
A professional visual inspection of your flat to identify hidden issues like cracks and dampness. Our detailed report helps you prevent costly repairs and confirms your property’s safety.
An annual maintenance contract focused on monitoring and maintaining watertightness in buildings to prevent leaks and moisture damage. Includes periodic inspections, reporting, and maintenance services tailored to the buildingтАЩs needs.
A preliminary assessment designed to define the detailed inspection scope and identify critical focus areas. Helps clarify project objectives and plan the next steps, ensuring efficient evaluation of all key building systems.
A remote inspection conducted via video calls, photos, and shared data for sites located outside served areas. Ideal for quick assessments or preliminary reviews without the need for on-site visits. Suitable for any building size.